Collector Notes
-
- SOUTHERN
RAILWAY LOCOMOTIVES
-
- Manufacturer
Introduced Scale Model Status
Notes
-
- Lord Nelson Class 4-6-0
- Maunsell
- 16
locomotives were built between August 1926 and November 1929. The first was withdrawn in
May 1961 and the last in October 1962. 1 locomotive has been preserved
-
- Marklin
1927
1 Not
currently produced
Ready to run live steam made for
-
Gamages, London
- Cimco
1930s
OO Manufacturer closed down Ready to run
- Bassett-Lowke 1935
O Not
currently produced
Ready to run, clockwork and
electric
- Bassett-Lowke 1937
1 Not
currently produced
Ready to run, live steam
- Hamblings
1937
OO Manufacturer closed down Ready to run
- Jamieson
1950
4mm Manufacturer closed down Kit
- Craftsman
1978
4mm Catalogue
Kit
- F.H.Smith
1981
O Catalogue
Kit
- MSC
1981
O Catalogue
Ready to run
- K's
1984
4mm Tools taken over
Kit
- }Nu-Kays
1990
Tools taken over
- }Nu-Cast
1993
Catalogue
- Sanspareil
1991
O Catalogue
Kit
- Bachmann
1992
OO Catalogue
Ready to run
- Lovett Scale Model
- (Australia)
1996
4mm Catalogue
Kit
- Ace Products
2007
O Catalogue
Kit
-
- Merchant Navy Class 4-6-2
- Bullied
- 30
locomotives were built between June 1941 and April 1949. All 30 were rebuilt (streamlining
removed) between February 1956 and october 1959. The first was withdrawn in February 1964
and the last in July 1967. Eleven locomotives have been preserved
-
- Graham Farish 1951
OO Not currently produced Ready to
run, unrebuilt streamlined version
- Tri-ang TT
1959
TT Manufacturer
closed down Ready to run, unrebuilt
streamlined version
- Wrenn
1977
OO Tools taken over
Ready to run, rebuilt version
- }Wrenn (Dapol)
1986
Tools taken over
Not released by Dapol
- }Wrenn (Mordvale)
2002
Not yet released
- Millholme
1979
4mm Manufacturer closed down Kit, unrebuilt streamlined version
- Langley
1979
N Catalogue
Kit, rebuilt version
- Graham Farish 1980
N Replaced
(see below)
Ready to run, unrebuilt
streamlined version
- RCP
1980
O Status
unknown
Kit, rebuilt version
- Alan Gibson / Roy
- Link
1983
4mm Not currently produced Kit,
limited edition, unrebuilt streamlined version
- K's
1983
4mm Tools taken over
Kit, unrebuilt streamlined version
- }Nu-Kays
1990
Tools taken over
- }Nu-cast
1993
Catalogue
- Model Loco
1983
4mm Tools taken over
Kit, rebuilt version. Manufactured by DJH
- }DJH
1986
4mm Catalogue
- Crownline
1994
4mm Tools taken over
Kit, unrebuilt streamlined version
- }PDK
2001
Catalogue
- Andy Beaton
1995
O Catalogue
Kit
- Cherry
1996
O Status
unknown
Ready to run, both versions produced
- Cherry
1996
1 Catalogue
Ready to run, both versions produced
- MTK
Unknown O Tools
taken over
Kit, rebuilt version
- }Nationalised
- Railways
Unknown
Not yet released
- Crownline
1996
4mm Tools taken over
Kit, limited edition, rebuilt version
- }PDK
2002
Catalogue
- Graham Farish 1997
N Tools
taken over
Ready to run, rebuilt version
- }Farish by
- Bachmann
2003
Catalogue
- Sanspareil
1999
O Catalogue
Kit
- Acorn
1999
O Catalogue
Kit, rebuilt version
- Modern Outline 2000
O Catalogue
Kit, rebuilt version
- Hornby
2000
OO Catalogue
Ready to run, rebuilt version
- Acorn
2003
O Catalogue
Ready to run only, streamlined version
- Transport Age Unknown O Tools
taken over
Kit (both types)
- }Seven Models
2009
Catalogue
- Dave Andrews 2009
O Catalogue
Kit, rebuilt version
-
- N15x Remembrance Class 4-6-0
- Maunsell. Rebuilt from LBSCR 4-6-4T's
- 7 locomotives
were rebuilt from LBSCR 4-6-4Ts between 1934 and 1936. The first was withdrawn in
1955 and the last in 1957
-
- Jamieson
1972
4mm Manufacturer closed down Kit
- Nu-Cast
1978
4mm Catalogue
Kit
- Mega Kits
1994
O Catalogue
Kit
- Delprado
2005
N Catalogue
Static model, produced with partwork magazine part 76
- Ace Products
2007
O Catalogue
Kit
-
- Q Class 0-6-0
- Maunsell
- 20
locomotives were built between January 1938 and September 1939. The first was withdrawn in
Nov 1962 and the last in May 1965. 1 locomotive has been preserved
-
- Formo (Farish)
1953
OO Manufacturer closed down Ready to run. Formo was the 3 rail label of
Graham Farish
- Wills
1961
4mm Tools taken over
Kit
- }South Eastern
- Finecast
1988
Catalogue
- Vulcan
Unknown O Manufacturer
closed down Ready to run. Vulcan of
Kendall
- Jaycraft
1979
4mm Manufacturer closed down Kit
- MTK
Unknown O
Tools
taken over
Kit
- }Nationalised
- Railways
Unknown
Not yet released
- Graham Hughes Unknown N Catalogue
Kit
- Crownline
1993
4mm Tool taken over
Kit
- }PDK
2002
Catalogue
- DJB
1996
O Catalogue
Kit
- Haywood
1997
O Catalogue
Kit
- Ace Trains
2005
O Catalogue
Ready to run
- Leinster
2006
O Catalogue
Kit
-
- Q1 Class 0-6-0
- Bullied
- 40
locomotives were built between March 1942 and December 1942. The first was withdrawn in
June 1963 and the last in January 1966. 1 locomotive has been preserved
-
- K's
1963
4mm Tools taken over
Kit
- }Nu-Kays
1990
Tools taken over
- }Nu-Cast
1993
Catalogue
- Bec
1966
3mm Tools taken over
Kit
- }ABS
1978
Tools taken over
- }3SMR
Unknown
Catalogue
- Langley
1983
N Catalogue
Kit
- Model Southern
- Engineering
1985
O Status
unknown
Ready to run
- Golden Arrow
1987
4mm Status unknown
Kit
- Little Engines
1987
4mm Tools taken over
Kit
- }South Eastern
- Finecast
1991
4mm Catalogue
- DJB
1988
O Catalogue
Kit
- DA
1988
O Tools
taken over
Kit
- }Oakville
1989
Tools taken over
- }Majestic
1993
Tools taken over
- }Wagon & Carriage
- Works
1996
Catalogue
- Crownline
1989
4mm Tools taken over
Kit
- }PDK
2002
Catalogue
- MTK
1992
O Tools
taken over
Kit
- }Nationalised
- Railways
Unknown
Not yet released
- DJB
Unknown 1 Catalogue
Kit
- Longhedge
Unknown 1 Catalogue
Kit
- Hornby
2003
OO Catalogue
Ready to run
- Modern Outline 2006
O Catalogue
Kit
- Dapol
2007
N Catalogue
Ready to run
-
- Schools Class V 4-4-0
- Maunsell
- 40
locomotives were built between March 1930 and July 1935. The first was withdrawn in
January 1961 and the last in December 1962. 3 locomotives have been preserved
-
- Harrod
1930
O Manufacturer
closed down Kit
- Parnell
1930
O Manufacturer
closed down Kit
- Southern Model Co 1934
4mm Manufacturer closed down Kit
- J.S.H Smitherson 1937
4mm Manufacturer closed down Kit
- Marklin
1934
O Not
currently produced
Ready to run. Made for Bassett-Lowke, clockwork and electric
- Beeson
1934
O Manufacturer
closed down Ready to run, made for
Bassett-Lowke
- W & H
1934
O Manufacturer
closed down Ready to run
- Locomo
1935
O Manufacturer
closed down Kit (Southern Model Company)
- Ejaycee
1936
O Manufacturer
closed down Ready to run
- Hamblings
1937
OO Manufacturer closed down Ready to run
- GEM
1938
OO Not currently produced
Ready to run, built to order
- Stewart Reidpath 1948
HO Manufacturer closed down Ready to run
- Hornby O
1937
O Manufacturer
closed down Ready to run
- Millbro
1937
O Manufacturer
closed down Ready to run
- Jamieson
1950
4mm Manufacturer closed down Kit
- Edward Exley
1956
O Manufacturer
closed down Ready to run, built to order
- Trix Twin
1959+
3.8mm
Manufacturer closed down Ready
to run. + due for release in 1939
- Kitmaster
1959
OO Tools taken over
Plastic kit
- }Airfix
1968
Tools taken over
- }Dapol
1986
Catalogue
- Wills
1973
4mm Tools taken over
Kit
- }South Eastern
- Finecast
1980
Catalogue
- Firmco
1974
O Tools
taken over
Kit
- }F.H.Smith
1980
Status unknown
- Aster
1976
1 Catalogue
Kit and ready to run. Live steam
- Craftsman
1978
4mm Catalogue
Kit
- Hornby
1981
OO Withdrawn see 2009
- Version below
Ready to run
- MSC
1981
O Catalogue
Ready to run
- DJB
1985
O Catalogue
Kit
- MTK
Unknown O
Tools
taken over
Kit
- }Nationalised
- Railways
Unknown
Not yet released
- Trix Twin Railway
- Collectors Assn. 1993
3.8mm
Status unknown Body
casting
- Crownline
1997
4mm Tools taken over
Kit
- }PDK
2002
Catalogue
- RPM
2000
O Catalogue
Ready to run
- Worsley Works 2001
3mm Catalogue
Kit
- Worsley Works 2002
2mm Catalogue
Kit
- North Star Design 2002
O Catalogue
Kit
- Dave Andrews 2003
O Catalogue
Kit
- Delprado
2004
N Catalogue
Static model, produced with partwork magazine part 32
- Finescale Brass
- (San Cheng)
2007
O Catalogue
Ready to run (brass)
- Ace Products
2007
O Catalogue
Kit
- Gladiator
2008
O Catalogue
Kit
- Hornby
2009
OO Catalogue
Ready to run, replaced 1981 version
- Ace Trains
2010
O Catalogue
Ready to run
-
- U/U1 Class 2-6-0
- Maunsell. Included locomotives rebuilt from K
Class 2-6-4T's
- 50 locomotives were built between March 1928
and May 1931. 20 of these were rebuilt from K (River) Class 2-6-4Ts. The first was
withdrawn in November 1962 and the last in June 1966. 4 U Class locomotives have been
preserved
- 21 U1 Class locomotives were built between June
1928 and November 1931. The first was withdrawn in November 1962 and the last in July 1963
-
- DJB
1981
O Catalogue
Kit
- DJH
1987
4mm Catalogue
Kit
- South Eastern
- Finecast
Unknown 4mm Catalogue
Kit
- Falcon Brass
1997
4mm Catalogue
Kit
- Ace Products
1999
O Catalogue
Kit
- Dave Andrews 2000
O Catalogue
Kit
-
- USA Dock Tanks 0-6-0T
- Vulcan Ironworks, United States Army
Transportation Corps
- for War
Department (used in UK and throughout Europe). Fourteen were purchased by Southern Railway
after war
- 14 (+ 1 for
spares) locomotives (all built in the USA during 1942) were purchased by the Southern
Railway between May 1946 and November 1947. The first was withdrawn in May 1962 and the
last in September 1962. 4 locomotives have been preserved
-
- Hornby-AcHo 1969
HO Manufacturer closed down Ready to run, made by Meccano, France
- Q Kits
1983
4mm Catalogue
Kit
- Chivers Finelines 1985
N Status
unknown
Kit
- Oakville
1991
O Tools
taken over
Kit
- }G.E.Models /
- Acorn 2002
Catalogue
Produced for G.E. by Acorn
- South Eastern
- Finecast
1995
4mm Catalogue
Kit
- Dave Alexander 1999
HO Catalogue
Kit
-
- W Class 2-6-4T
- Maunsell
- 15
locomotives were built between January 1932 and April 1936. The first was withdrawn in
February 1963 and the last in August 1964
-
- DJB
1982
O Catalogue
Kit
- DJB
Unknown 1 Catalogue
Kit
- Crownline
1997
4mm Tools taken over
Kit
- }PDK
2002
Catalogue
- Ace Products
2002
O Catalogue
Kit
- South Eastern
- Finecast
2002
4mm
Catalogue
Kit
- Sanspareil
2004
O Catalogue
Kit
- Golden Arrow
2005
4mm Catalogue
Body moulding
-
- West Country / Battle of Britain
4-6-2
- Bullied
- 110
locomotives were built between May 1945 and January 1951. 60 were rebuilt (streamlining
removed) between June 1957 and May 1961. The first was withdrawn in June 1963 and the last
in July 1967. Twenty locomotives have been preserved
-
- Hamblings
1950
OO Manufacturer
closed down Ready to run. Streamlined
version
- Hornby-Dublo
1961
OO Tools taken over
Ready to run, rebuilt version
- }Triang-Wrenn
1968
Tools taken over
- }Wrenn
1972
Tools taken over
- }Wrenn (Dapol)
1986
Tools taken over
Not released by Dapol
- }Wrenn(Mordvale)
2001
Not yet released
- Tri-ang
1961
OO Tools taken over
Ready to run. Streamlined Battle of Britain version
- }Tri-ang/Hornby
1965
Tools taken over
- }Hornby
1971
Replaced see 2001 below Model
upgraded in 1981 and 1995
- Kitmaster
1960
OO Tools taken over
Plastic kit, streamlined version
- }Airfix
1968
Tools taken over
- }Dapol
1986
Catalogue
- Graham Farish 1974
N Replaced
see below Ready to run, streamlined version.
Locomotive body tool damaged
- 1994.
- Ravenscale
1980
O Tools
taken over
Kit, streamlined version
- }Ace Products
2004
Catalogue
- Steamcraft
1982
4mm Manufacturer closed down Kit, streamlined version
- Wrenn
1972
Tools taken over
Ready to run. Streamlined version
- }Wrenn (Dapol)
1986
Tools taken over
Not released by Dapol
- }Wrenn(Mordvale)
2001
Not yet released
- Bristol Models 1980
4mm Manufacturer closed down Kit, streamlined version
- MSC
1981
OO Catalogue
Kit, streamlined version
- Model Loco
1984
4mm Tools taken over
Kit (made by DJH), rebuilt version
- }DJH
1986
Catalogue
- DJB
1986
O Catalogue
Kit, streamlined version. Kit upgraded 1996
- Perseverance
1987
4mm Status unknown
Kit, rebuilt version
- Westward
1987
4mm Status unknown
Kit, streamlined version
- MTK
1989
O Tools
taken over
Kit, streamlined version
- }Nationalised
- Railways
Unknown
Not yet released
- MTK
1989
O Tools
taken over
Kit, rebuilt version
- }Nationalised
- Railways
Unknown
Not yet released
- DA
1989
O Tools
taken over
Kit, streamlined version
- }Oakville
1991
Tools taken over
- }Majestic
1993
Tools taken over
- }Wagon & Carriage
- Works
1996
Catalogue
- Crownline
1990
4mm Tools taken over
Kit, streamlined version
- }PDK
2002
Catalogue
- DJB
1991
O Catalogue
Kit, rebuilt version
- DJB
Unknown 1 Catalogue
Kit, streamlined version
- Big 4 (Acorn)
1995
O Tools
taken over
Kit, rebuilt version. Made by Acorn Metalcraft
- }Acme
1997
Catalogue
- Crownline
1996
4mm Tools taken over
Kit, rebuilt version
- }PDK
2002
Catalogue
- DJB
1996
O Catalogue
Kit, live steam, streamlined version
- Graham Farish 1997
N Tools
taken over
Ready to run, rebuilt version
- }Farish by
- Bachmann
2004
N Catalogue
- Graham Farish 1999
N Tools
taken over
Ready to run, streamlined version.
Replaced earlier model
- }Farish by
- Bachmann
2004
Catalogue
- Genesis
2000
4mm Catalogue
Kit, streamlined version
- Acme
2000
1 Catalogue
Kit
- Firedrake
- Productions
Unknown HO Not currently produced
Kit, produced for British 1:87 Scale Modelling
- Hornby
2001
OO Withdrawn
Ready to run, streamlined version.
-
Replaced 1961 version above
- Meteor
2003
O Catalogue
Kit
- Martin Finney
2003
O Catalogue
Kit. Streamlined version
- Dave Andrews 2006
O Catalogue
Kit, rebuilt version
- Aster
2006
1 Catalogue
Ready to run + kit, streamlined version
- Hornby
2007
OO Catalogue
Ready to run, rebuilt version
- Ace Trains
2010
O Catalogue
Ready to run
- Masterpiece Models XXXX
O
Under development
Ready to run
-
- Z Class 0-8-0T
- Maunsell
- 8 locomotives
were built between March 1929 and September 1929. The first was withdrawn in October 1962
and the last in December 1962
-
- Denny
1962
O Manufacturer
closed down Body moulding
- Denny
1962
4mm Manufacturer closed down Body moulding
- Denny
1962
3mm Manufacturer closed down Body moulding
- Jamieson
1968
4mm Manufacturer closed down Kit
- Millholme
1980
4mm Manufacturer closed down Kit
- Jidenco
1981
4mm Tools taken over
Kit
- }Falcon Brass
1985
Catalogue
- Jidenco
1981
4mm Tools taken over
Kit
- }Shedmaster
1986
Catalogue
- GEM
Unknown N Catalogue
Kit
- DMR
2001
4mm Catalogue
Kit
- DMR
2003
O Catalogue
Kit
- Golden Arrow
2005
4mm Catalogue
Body moulding