- Collector Notes
-
- LONDON, BRIGHTON
& SOUTH COAST RAILWAY LOCOMOTIVES
-
- Manufacturer
Introduced Scale Model Status
Notes
-
- A1/A1X
Class 0-6-0T (Terrier)
- Stroudley / Marsh
- 50
locomotives were built between September 1872 and September 1880. Twenty-two locomotives
were rebuilt into A1X Class between January 1912 and April 1943. The first was withdrawn
in June 1898 and the last in November 1963. 10 locomotives have been preserved
- Stanley Beeson 1931
O Manufacturer
closed down Ready to run, handbuilt
- W & H
1930s
OO Manufacturer closed down Ready to run
- Hamblings
1952
OO Manufacturer closed down Ready to run
- Douglass
1957
O Manufacturer
closed down Glass fibre body moulding
- K's
1957
4mm Tools taken over
Kit
- }Nu-Kays
1990
Tools taken over
- }Nu-Cast
1993
Catalogue
-
- Ravenscale
1975
O Status
unknown
Kit
- }Ace Products
2003
Catalogue
Retooled by Ace before release
- Vulcan
1984
O Tools
taken over
Kit
- }Underhill
1988
Tools taken over
- }ABS
1997
Catalogue
- Loddon
1985
4mm Tools taken over
Kit
- }Falcon Brass
1988
Status unknown
- Westward
1986
4mm Status unknown
Kit
- Kittle
1986
1 Status
unknown
Ready to run, live steam, The Victorian Connection
- Dapol
1989
OO Tools taken over
Ready to run
- }Hornby
1998
Catalogue
- Loco Shop
1994
O Tools
taken over
Kit
- }Roxey
1998
Catalogue
- 3mm Society
Unknown 3mm Catalogue
Kit
- Longhedge
1996
1 Catalogue
Kit
- Javelin
2003
O Catalogue
Kit
- Garden Railway
- Specialists
Unknown 3 Catalogue
Kit
- Ace
Products
2006
O Catalogue
Kit
- Ace
Products
2006
1 Catalogue
Kit
- Finescale Brass
- (San Cheng)
2007
O Catalogue
Ready to run (brass)
- Dapol
2009
N Catalogue
Ready to run
- Tower Models
2009
1 Catalogue
Ready to run (brass)
-
- B /later B1
Class (Gladstones) 0-4-2
- Stroudley
- 36 locomotives were built between January 1884
and April 1891. The first was withdrawn in April 1910 and the last in September 1933
- GEM
1968
4mm Status unknown
Kit, upgraded 1982
- Albion
2003
O Catalogue
Kit
-
- B4 Class 4-4-0
- Billinton
- 33
locomotives were built between December 1899 and September 1902. 12 of the Class were
rebuilt to B4S Class locomotives. The first was withdrawn in May 1934 and the last in May
1951
- Sanspareil
2004
O Catalogue
Kit
- Ace Products
2005
O Catalogue
Kit
-
-
- B4X Class 4-4-0
- Billinton
- 33
locomotives were built between December 1899 and June 1902. The first was withdrawn in
January 1936 and the last in December 1951
- Maintrack
1983
4mm Manufacturer closed down Kit
-
- C Class
0-6-0
- Stroudley
- 28
locomotives were built between February 1893 and October 1900. 10 were rebuilt with 2 dome
boilers. The first was withdrawn in October 1935 and the last in November 1961
- EB Models
2004
4mm
Catalogue
Kit
-
- C1 Class
0-6-0
- Stroudley
- 12 locomotives were built between August 1882
and July 1887. The first was withdrawn in August 1907 and the last in November 1920
- Sanspareil
1999
O Catalogue
Kit
- EB Models
2004
4mm
Catalogue
Kit
-
- C2 Class
0-6-0
- Billinton
- 55 locomotives were built between February 1893
and February 1902. 45 locomotives were rebuilt as C2X Class between September 1910 and
December 1939. The first was withdrawn in November 1936 and the last in February 1950
- DJH
1983
4mm Catalogue
Kit
- Ace Products
2002
O Catalogue
Kit
- Meteor
XXXX
O
Under development
Kit
-
- C2X Class
0-6-0 (Rebuilt from C2
Class)
- Marsh
- 45
locomotives were rebuilt from C2 Class between July 1908 and December 1939. The first was
withdrawn in March 1957 and the last in February 1962
- DJH
1982
4mm Catalogue
Kit
- Nu-Cast
1982
4mm Catalogue
Kit
- Ace Products
2002
O Catalogue
Kit
- Meteor
2003
O Catalogue
Kit
-
- D1 Class
0-4-2T
- Stroudley
- 125
locomotives were built between November 1873 and March 1887. The first was withdrawn in
December 1903 and the last in December 1951
- Windsor
1940's
O Manufacturer
closed down Ready to run
- Wills
1983
4mm Tools taken over
Kit
- }South Eastern
- Finecast
1988
Catalogue
- MSC
1975
O Replaced
(see below)
Kit, Ready to run 1978
- Albion
1989
4mm Catalogue
Kit
- Gateneal
1990
O Tools
taken over
Kit
- }Mega Kits
1992
Catalogue
- Meteor
1992
O Tools
taken over
Kit
- }Wagon & Carriage
- Works
Unknown
Tools taken over
- }MSC
2003
Catalogue
- Albion
Unknown O Catalogue
Kit
- RPM
2000
O Catalogue
Ready to run
-
- D2 Class
0-4-2 (Lyons Class)
- Stroudley
- 14 locomotives were built between September 1876
and October 1883. The first was withdrawn in November 1902 and the last in March 1907
- Sanspareil
1996
4mm Catalogue
Kit
- Sanspareil
1996
O Catalogue
Kit
- Peter K
1997
4mm Catalogue
Kit
-
- D3 Class
0-4-4T
- Billinton
- 36
locomotives were built between June 1892 and November 1896. Two locomotives were rebuilt
in D3x Class in 1909 (see below). The first was withdrawn in March 1933 and the last in
September 1955
- Chivers
Finelines 1983
4mm Catalogue
Kit
- MSC
1985
O Catalogue
Kit
-
- D3X Class
0-4-4T (Rebuilt from D3 Class)
- Billinton
- 2
locomotives were rebuilt from D3 Class (see above) in 1909. The first was withdrawn in May
1937 and the last in July 1948
- Chivers
Finelines 1992
4mm Catalogue
Kit
- E Class
0-6-0T
- Stroudley
- 78 locomotives were built between October 1874
and December 1891. The first was withdrawn in March 1911 and the last in January 1960
- Wagon &
Carriage
- Works
Unknown O Status
unknown
Kit
-
- E1 Class
0-6-0T
- Stroudley
- 11
locomotives were rebuilt from E1 Class locomotives between 1927 and 1930. The first was
withdrawn in April 1955 and the last in February 1960
- Wills
1963
4mm Tools taken over
Kit
- }South Eastern
- Finecast
1988
Catalogue
- MSC
1975
O Replaced
(see below)
Kit
- Kittle
1985
1 Not
currently produced
Ready to run. Victorian Connection
range. Limited Edition
- Albion
1989
4mm Status unknown
Kit
- Vulcan (Eastbourne)Unknown O Manufacturer
closed down Kit
- Gateneal
1990
O Tools
taken over
Kit
- }Mega Kits
1992
Catalogue
- Meteor
1990
O Tools
taken over
Kit
- }Wagon & Carriage
- Works
Unknown
Tools taken over
- }MSC
2002
Catalogue
- RPM
2000
O Catalogue
Kit
-
- E2 0-6-0T
- Billinton
- 10 locomotives were built between June 1913 and
October 1916. The first was withdrawn in February 1961 and the last in April 1963
- Trix
1961
3.8mm Manufacturer closed
down Ready to run (on HO/OO track)
- Wills
1960
4mm Moulds taken over
Kit
- }South Eastern
- Finecast
1988
Catalogue
- Esanel
1961
3mm Moulds taken over
Kit
- }Bec
1964
Moulds taken over
- }ABS
1978
Status unknown
- Langley
1977
N Catalogue
Kit
- Hornby
1979
OO Not currently produced Ready to
run. Moulds altered to produce 'Thomas'
- Ace Products
1997
O Catalogue
Kit
-
- E3 Class
0-6-2T
- Billinton
- 16 locomotives were built between November 1894
and December 1895. The first was withdrawn in May 1949 and the last in November 1959
- MSC
1990
O Catalogue
Kit
-
- E4 / E4X
Class 0-6-2T
- Billinton
- 75 locomotives were built between December 1897
and September 1903. Four locomotives were rebuilt as E4X Class between 1909 and 1911. The
first was withdrawn in May 1955 and the last in October 1962
- Langley
1977
N Catalogue
Kit
- Weald Models 1979
4mm Manufacturer closed down Kit
- MSC
Unknown O Catalogue
Kit
- Dean Sidings
1997
4mm Catalogue
Resin moulded body
- OO Works
2004
OO Catalogue
Ready to run
- Roxey
2005
O Catalogue
Kit
-
- E5 Class
0-6-2T
- Billinton
- 30 locomotives were built between November 1902
and September 1904. The first was withdrawn in August 1944 and the last in January 1956
- Wills
1960
4mm Moulds taken over
Kit
- }South Eastern
- Finecast
1988
Catalogue
- Albion
1994
4mm Catalogue
Kit
- Langley
Unknown N Catalogue
Kit
- Albion
2004
O Catalogue
Kit
- Ace Products
2004
O Catalogue
Kit
-
- E6 Class
0-6-2T
- Billinton
- 12 locomotives were built between December 1904
and December 1905. Two locomotives were rebuilt as E6X Class in 1911. The first was
withdrawn in September 1957 and the last in December 1962
- South Eastern Finecast 1988
4mm Catalogue
Kit
- Albion
1994
4mm Catalogue
Kit
- Albion
2007
O Catalogue
Kit
-
- G Class 2-2-2
- Stroudley
- 26 locomotives were built between December 1874
and May 1882. The first was withdrawn in May 1907 and the last in January 1911
- AGH
1980
O Status
unknown
Ready to run
- Peter K
1983
4mm Status unknown
Kit
- Sanspareil
1992
O Status
unknown
Kit
-
- H1 Class 4-4-2
- Marsh
- 5
locomotives were built between December 1905 and February 1906. The first was withdrawn in
January 1944 and the last in July 1951
- Douglass
1961
O Manufacturer
closed down Glass fibre body moulding
- Ace Products
1997
O Catalogue
Kit
- DJH
2001
4mm Catalogue
Kit
- Ace Products
2001
4mm Catalogue
Kit
- Gladiator
2007
O Catalogue
Kit
-
- H2 Class 4-4-2
- Marsh, modified
Billinton
- 6 locomotives were built between June 1911 and
January 1912. The first was withdrawn in January 1944 and the last in September 1956
- Douglass
1961
O Manufacturer
closed down Glass fibre body moulding
- Jidenco
1982
4mm Tools taken over
Kit
- }FalconBrass
1985
Status unknown
- Ace Products
2001
O Catalogue
Kit
- Ace Products
2001
4mm Catalogue
Kit
- DJH
2002
4mm Catalogue
Kit
- Gladiator
2004
O Catalogue
Kit
-
- I3 Class
4-4-2T
- Marsh/Billington
- 27 locomotives were built between October 1907
and March 1913. The first was withdrawn in November 1944 and the last in May 1952
- Bing
1911
1 Manufacturer
closed down Made for Bassett-Lowke.
Clockwork
- Bing
1911
O Manufacturer
closed down Made for Bassett-Lowke.
Clockwork
- Marklin
1920s
O Not
currently produced
Ready to run
- Wills
1976
4mm Tools taken over
Kit
- }South Eastern
- Finecast
1988
Catalogue
- Gosling
1978
O Status
unknown
Ready to run. Live steam
- Loco Shop
Unknown O Tools
taken over
Kit
- }Roxey
1998
Catalogue
- Meteor
1997
O Tools
taken over
Kit
- }Wagon & Carriage
- Works
Unknown
Tools taken over
- }MSC
2003
Catalogue
- Ace Products
2006
O
Catalogue
Kit
-
- J Class
4-6-2T
- Marsh/Billington
- 2
locomotives were built between December 1910 and March 1912. Both were withdrawn in
June1951
- Chivers Finelines 1986
4mm Status unknown
Kit
- Maintrack
1994
OO Status unknown
Ready to run. Limited edition
- Ace Products
1996
O Catalogue
Kit
-
- K Class 2-6-0
- Billinton
- 17 locomotives were built between September 1913
and March 1921. The first was withdrawn in November 1962 and the last in December 1962
- K's
1977
4mm Tools taken over
Kit
- }Nu-Kays
1990
Tools taken over
- }Nu-Cast
1993
Catalogue
Kit upgraded 1997
- Mallard
1979
4mm Moulds taken over
Kit
- }Blacksmith
1986
Catalogue
- Graham Hughes 1995
N Catalogue
Kit
- Ace Products
1997
O
Catalogue
Kit
- Ace Products
2004
4mm
Catalogue
Kit
-
- L Class
4-6-4T
- Billinton
- 7
locomotives were built between April 1914 and April 1922. These were rebuilt to N15X Class
4-6-0s
between December 1934 and February 1936 by the Southern Railway (withdrawn in this form
between January 1955 and July 1957)
- Marklin
192X
1 Not
currently produced
Ready to run
- Marklin
192X
O Not
currently produced
Ready to run
- Langley
1977
4mm Catalogue
Kit
- Ace Products
1996
O Catalogue
Kit
- Ace Products
2000
4mm Catalogue
Kit