Collector Notes
- BRECON
& MERTHYR RAILWAY LOCOMOTIVES
- Manufacturer
Introduced Scale Model Status
Notes
-
- Class 1 0-6-0T
- R Stephenson / J
Fowler
- 12 locomotives were
built between February 1884 and January 1866. Three of the Class were rebuilt as Pannier
Tanks between October 1922 and September 1926. The first was withdrawn in July 1923 and
the last in December 1934.
- C Lester
1987
4mm Tools taken over
Kit
- }Falcon
1988
Tools taken over
- }Redcraft
1991
Catalogue
Also ready to run
- C Lester
1987
O Tools
taken over
Kit
- }Falcon
1988
Tools taken over
- }Redcraft
1993
Catalogue
Also ready to run
-
- Class 9 2-4-0T
- R Stephenson
- 6
locomotives were built between December 1888 and October 1904. The first was withdrawn in
December 1921 and the last in October 1924
- C Lester
1987
4mm Tools taken over
Kit
- }Falcon
1988
Tools taken over
- }Redcraft
1991
Catalogue
Also ready to run
- C Lester
1987
O Tools
taken over
Kit
- }Falcon
1988
Tools taken over
- }Redcraft
1993
Catalogue
Also ready to run
-
-
-