Collector Notes

BRECON & MERTHYR RAILWAY LOCOMOTIVES
Manufacturer               Introduced      Scale  Model Status                          Notes
 
Class 1 0-6-0T
R Stephenson / J Fowler
12 locomotives were built between February 1884 and January 1866. Three of the Class were rebuilt as Pannier Tanks between October 1922 and September 1926. The first was withdrawn in July 1923 and the last in December 1934.
C Lester                      1987                4mm   Tools taken over                     Kit
 }Falcon                       1988                            Tools taken over
 }Redcraft                    1991                            Catalogue                               Also ready to run 
C Lester                      1987                O         Tools taken over                     Kit
 }Falcon                       1988                            Tools taken over
 }Redcraft                    1993                            Catalogue                               Also ready to run
 
Class 9 2-4-0T
R Stephenson
6 locomotives were built between December 1888 and October 1904. The first was withdrawn in December 1921 and the last in October 1924
C Lester                      1987                4mm   Tools taken over                     Kit
 }Falcon                       1988                            Tools taken over
 }Redcraft                    1991                            Catalogue                               Also ready to run
C Lester                      1987                O         Tools taken over                     Kit
 }Falcon                       1988                            Tools taken over
 }Redcraft                    1993                            Catalogue                               Also ready to run